PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Building rebar mats for Elev. 7-Stair -4,5 (2nd Floor) Facing South-East (800x600).jpg Compacting 2 lift around Elev. 1,2,3 Facing South (800x600).jpg Installing bearing plate boxes at Elev. 7-Stair -4,5 Facing North (800x600).jpg Installing rebar mats at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Installing tesion cables at Derrick -2 Facing North-West (800x600).jpg Backfilling around Monumental Stair radius Facing West (800x600).jpg Installing rebar mats at Elev. 7-Stair -4,5 Facing North (800x600).jpg Tying rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing South-East (800x600).jpg
Previous pageNext page Installing tesion cables at Derrick -2 Facing North-West (800x600)
Installing tesion cables at Derrick -2 Facing North-West (800x600)